<< cost of production costa >>

cost overrun Meaning in Odia (Oriya). ( cost overrun ଶବ୍ଦର ଓଡିଆ ଅର୍ଥ)



ଅତ୍ୟଧିକ ଖର୍ଚ୍ଚ,

Noun:

ଏହାର ମୂଲ୍ୟ ପଦଦଳିତ ହୋଇଛି |,

cost overrun తెలుగు అర్థానికి ఉదాహరణ:

ତତ୍କାଳୀନ ରାଜା ଥିଓଡୋରିକ୍ ଅତ୍ୟଧିକ ଖର୍ଚ୍ଚ ପାଇଁ ଏହାର କଟୁ ସମାଲୋଚନା କରିଥିଲେ ।

cost overrun's Usage Examples:

Freedom was launched on 23 September 2006, cost overruns during Freedom's construction, combined with projected future overruns, led the government to issue a Stop-work in January 2007.


The cost and cost overrun for Salt Lake City 2002 compares with costs of US"2.


While Kunicon's original goal was to hold a convention in twelve major cities across the United States, these plans were cut short after 4 conventions as Kunicon continued to be plagued with controversy and cost overruns.


has been the target of high local press attention, because of the high cost overrun.


The cost and cost overrun for Montreal 1976 compares.


Despite the use of many off the shelf technologies that were intended to allow rapid and low-cost development, a series of technical problems and massive cost overruns resulted in the cancellation of the project in 1985.


2007 and a 500-million-dollar budget, but the project has had numerous delays and cost overruns, and underwent a major redesign in 2005.


The ASDS was canceled in 2009 due to cost overruns and reliability issues, after the prototype was destroyed in a fire in.


It is often different for cost overruns and cost underruns.


Projected cost overruns exceeding 70% from C"7.


C-5–Ortigas Interchange was marred by cost overruns and accusations of overpricing by the contractor, Sumitomo.


As in the previous several elections, the Honolulu metro and its cost overruns was a major topic of the campaign.


which cost US"15 billion with a cost overrun of 76%, and those of Rio 2016 which cost US"4.



Synonyms:

indeterminate, undetermined,

Antonyms:

determinate, determinable, certain,

cost overrun's Meaning in Other Sites