उपग्रेड Meaning in English
उपग्रेड शब्द का अंग्रेजी अर्थ : subgrade
, upgrade
ऐसे ही कुछ और शब्द
नवीनीकरण योग्यउन्नयन योग्य
अपहेविंग
उत्प्रवण
असबाबवाला
पोशिश
असबाबघर
समारक्षण
अपलैंड्स
उपनल
उपर का
उध्र्व
अपर कार्बोनिफेरस अवधि
उच्चवर्गीय वस्तु
उपरी तल्ला
उपग्रेड इसके अंग्रेजी अर्थ का उदाहरण
Compared to X2, Class 73 has an upgraded bogie construction and motors in multiple cars instead of having a locomotive unit.
After the power upgrade, the station was sold and renamed Power 92.
SaskPower continues to modernize and maintain the plant, with re-runnering and upgrade of controls for Units 4,5 and 6 under way as of 2012.
Thus, incentive licensing was successful in inducing a large number of amateurs to study and upgrade their knowledge and license privileges.
Less than 24 hours, the tropical storm watch was upgraded to a tropical storm warning, while there was also an additional hurricane watch.
In 2015, the stadium received major upgrades due to the school officially becoming the owner.
A short freeway segment (about ) was built at SR 99 in Kern County in conjunction with a portion of the freeway upgrade to the Golden State Freeway (SR 99).
The existing runway will also be upgraded.
Tecmo also released an upgrade titled Dead or Alive++ for the arcades in Japan which was based on the PlayStation version.
Floodlights were installed in 1956 and upgraded in 1965.
The plans include a substantial upgrade of the existing bird hide.
This saw the upgrade to refueling station capacities by adding an "arm" to one of the ship's "M" Frames.
Earlier model Corsairs can be upgraded to Conquest I standard with factory provided modification kits.
उपग्रेड इसके अंग्रेजी अर्थ का उदाहरण
The of track took so long to build because of the unstable subgrade through the marsh, requiring tons of crushed rock to stabilize the subgrade.
According to Network Rail, the trackbed is the layers of ballast and sub-ballast above a prepared subgrade/formation (see diagram).
It is designed primarily to reduce the stress on the subgrade.
In areas below foundation level (subgrade areas), particularly those formed in concrete, vapor retarder placement can be problematic, as moisture infiltration from capillary action can exceed water vapor movement outward through framed and insulated walls.
Construction of a gravel road begins with the base or subgrade layer.
Geotextile fabric may be laid to improve the stability of the subgrade layer.
The surface layer is constructed atop the subgrade layer.
The surface layer will follow the crown established by the subgrade layer.
Scarification of the subgrade layer prior to application of the surface gravel layer can be performed to increase the mixing and adherence between layers.